How to compare commercial electrical maintenance quotes
Compare asset coverage, return visits, access costs and reporting before choosing a contractor for your building.
Two quotes can both say “six-monthly maintenance” and buy very different things. One may cover every nominated fitting, include a second attendance for locked areas and supply an asset register. The other may price one visit and charge separately for access equipment, reporting and returns. Put them against the same scope before comparing totals.
Give both bidders the same information
Issue the same site list, approximate quantities, operating hours and last report. Identify anything unverified. If both bidders need to confirm the number of fittings, ask each to state the quantity allowed, the rate for additions and how the final count will be agreed. A fixed price based on an undisclosed quantity is difficult to compare.
Price the awkward visit
Choose one real feature of your site. It might be a high-bay fitting above stocked racking or a board only accessible after the last tenant leaves. Ask each contractor to explain how that item would be serviced, what access equipment is allowed and what would trigger an extra charge. This often reveals more than an hourly rate.
Read the sample report before you sign
Pick a failed item on a sample report and see whether you could raise a purchase order from it. Look for location, finding, proposed action, urgency and a way to match the completed repair to the original defect. Ask who owns the asset data and whether you can export it at contract end.
Compare the recurring fee, likely separately priced work and the time your team will spend administering both. If the bids still differ materially, ask each bidder to mark exclusions against your scope in writing. You will then know what the price difference actually buys.